Home/Outboards/Johnson Evinrude/Installation Of Thru Hub Propeller

Installation of Thru-Hub PropellerOutboards1985 Johnson/Evinrude 2HP thru V-6 models

  1. Avoid accidental starting of motor. Disconnect the charge coil connector(s) between stator assembly and power pack(s).
  2. Coat the propeller shaft splines sparingly with Triple-Guard Grease.
  3. Place the thrust bushing "A" in the popeller and then slide the assembIy on to the propeller shaft.
  4. Install the thrust washer "B" splines of the propeller shaft.
  5. Install and tighten the propeller nut "C" to torque of 14 N-m (120 in. Ibs., 10 ft. Ibs.) and then continue to tighten to align next cotter pin hole. The propeller shaft should turn freely (engine in Neutral) after the propeller is installed.
  6. Install new cotter pin "D", bending ends over the nut.

Propeller diagram

Updated on: Saturday, November 21, 2020

×

Navigation